CCM RFP template: 84 requirement lines you can edit, weight and download
This CCM RFP template gives you 84 vendor-neutral requirement lines in 12 sections, from authoring to contract terms. Pick your lines, mark each Mandatory or Desirable, set section weights, then copy or download a CSV. Keep price in a separate schedule and settle the finalists with a proof of concept.
Need to send a CCM RFP and don’t want to start from a blank page? This CCM RFP template gives you 84 ready-made requirement lines in 12 sections, plus a response scale, a pricing schedule and the document structure around them.
It’s vendor-neutral, so it works whether you’re replacing SmartCOMM, Quadient Inspire, OpenText Exstream, Oracle Documaker or an in-house system. Edit it below, then copy the lines or download a CSV. When the answers come back, score them with the CCM vendor scorecard.
How to use the template
Every line has a stable ID, like AU-03, so everyone can point to it in responses, demos and scoring. Before you send it, decide three things per line: keep or drop, Mandatory or Desirable, and how much its section weighs.
Ask vendors to answer each line with one code and a short explanation:
| Code | Meaning | Ask them to show |
|---|---|---|
| Y | Works today in the proposed edition, no custom code | A document reference, screenshot or demo slot |
| P | Partly there, or needs configuration or services | What’s missing and who builds it |
| R | On the roadmap | Target release, and whether it’s committed |
| N | Not available | Nothing |
Treat a Y on a Mandatory line as unproven until you see it. An N or R on a Mandatory line knocks the vendor out before scoring starts.
Build your requirement list
All 84 lines are here, with suggested priorities and weights for a regulated enterprise sending both print and digital. Untick what doesn’t apply, adjust priorities and weights, then copy or download. The CSV comes with columns for each vendor’s response and evidence, so it’s ready to send.
Weights suit a regulated enterprise with batch print and digital. Keep the sections you use at 100%. Price is scored separately.
84 requirements across 12 sections. Suggested section weights total 100%.
Free to reuse. Regulatory lines use US rules as examples, so swap in the rules that apply to you.
Wrap it in a standard RFP
Vendors answer faster and more consistently when every section below is in the document.
- Introduction: who you are and why you’re running the project.
- Current state: platforms, template count, annual volumes by channel and key integrations.
- Scope: document types, channels, regions and languages.
- Instructions: format, deadlines, contacts and the Y, P, R, N scale.
- Requirements: the lines you built above.
- Proof of concept: the templates and test data you’ll provide, and how you’ll score the result.
- Pricing schedule: your own unit table (below).
- References: at least two customers of similar size, ideally one that moved off your current platform.
Make every vendor price the same units
CCM vendors price in different ways. G2 says Quadient prices mainly on volume and users, TrustRadius reviewers mention pay-per-page, and Oracle lists per-document or per-processor options on Celent. Your own schedule makes the quotes comparable.
| Unit | What to ask for |
|---|---|
| Environments | Price for each: development, test, staging, production, disaster recovery |
| Author seats | Price per designer, business author and front-office user |
| Volume | Price per page, document or transaction, with tier limits and overage rates |
| Connectors | Price per packaged integration and per API call tier |
| Services | Implementation, migration and training, with day rates |
| Term | Price for each year, plus the renewal cap |
Our CCM software pricing guide explains what drives each unit.
Ask about AI controls, not just AI features
AI moves fast, so the template makes vendors label every AI feature as generally available, early access or roadmap. IDC’s Amy Machado said in September 2026 that buyers should also weigh how AI “capabilities address governance, authorization, auditability, and data protection.” That’s why audit trail, rollback and model disclosure are Mandatory.
After the RFP: knock out, score, then test
Agree your weights before the RFP goes out. Drop anyone who fails a Mandatory line, score the rest with the CCM vendor scorecard, and only then open the pricing.
Take your top two or three to a proof of concept. Give each the same three hard templates and test data, and score the output, not the slides. If you outsource print and mail, visit the sites too: Kemal Carr of Madison Advisors says the sponsor, sourcing manager and a print and mail expert should all attend.
Migrating as part of the project? Read the CCM migration guide so your migration lines match your plan. Still building a shortlist? Start with the customer communications management software guide, the CCM benchmark, SmartCOMM alternatives and the cloud CCM options. For the accessibility lines, see accessible customer communications.
Get the editable version
Leave your details and we send the editable file, plus a short note on which vendors to invite for your industry.
Email hello@ccmcompared.comWe only share your details with a vendor if you ask us to.
Frequently asked questions
How many vendors should receive a CCM RFP?
Three to five. Your incumbent plus two to four alternatives picked on deployment model, volume and integrations is a common mix.
Should pricing be in the same RFP response?
Ask for it in a separate schedule using your own units, so every vendor quotes the same way. Score the functional answers first so cost doesn’t sway the technical review.
What is the difference between a CCM RFI and an RFP?
An RFI is a short questionnaire that builds your shortlist. An RFP is the full, scored requirement set you send to that shortlist. The deployment, integration and commercial sections of this template work as an RFI on their own.
Do we need to share our templates with vendors during the RFP?
Yes, a small anonymized sample for the proof of concept: usually three of your hardest templates with test data. It shows how each platform handles your real rules, which a vendor demo can’t.
Is a CCM RFP the same as a CMS or CRM RFP?
No. CCM software composes and delivers regulated documents like policies, statements and notices. A CMS runs websites and a CRM manages customer records, so their RFPs cover different things.
Sources
- eCFR: 42 CFR 422.2267, required materials and content (Medicare Advantage)
- eCFR via Cornell LII: 45 CFR 92.11, notice of availability of language assistance
- CFPB: Regulation Z, 12 CFR 1026.7 periodic statement
- CFPB: Regulation B, 12 CFR 1002.9 notifications
- ISO 14289-2:2024 (PDF/UA-2)
- BNN Bloomberg (press release): Messagepoint named a Leader in the 2026 IDC MarketScape (IDC comment on AI governance)
- G2: Quadient Inspire pricing
- TrustRadius: Quadient Inspire pricing
- Celent VendorMatch: Oracle Customer Communication Management (vendor-supplied listing)
- Capterra: SmartCOMM
- DOCUMENT Strategy Media: Seven Critical Steps When Choosing a Partner from an RFP (Kemal Carr, Madison Advisors, 2021)
CCM Compared is independent and not affiliated with Smart Communications or any vendor named here. Product names are trademarks of their owners and are used to identify products only. See our methodology and disclosure. Spotted an error? Request a correction.